Kelly D Cowlishaw
Montana Manroc:
President of Montana Manroc - Stillwater
Mine – Nye Montana – Drove approximately
3000’ of development and production
Alimak raise. Currently operating
four experimental stope designs
off of Alimak raise climbers.
Frank Coluccio Construction Company:
Superintendent – Jet Grouting for
soil improvement – Hawaii
9’ x 9’ Roadheader Tunnel – Sand
Wash Dam, Utah
Thyssen Mining Co:
Superintendent - Getchell Mine
Turquoise Ridge Project - Winnemucca
Nevada
LRL Construction:
Superintendent - NATM test shaft
for Sound Transit Light Rail System
(subcontracted by Frank Coluccio
Construction Company.
Thyssen Mining Co:
Superintendent - Stillwater Mine,
Nye Montana. Development and stope
mining.
Guy F. Atkinson/Clark Construction:
Asst. Superintendent - NATM tunneling
- San Diego State University light
rail tunnel, San Diego, California
Thyssen Mining Co:
General Superintendent - Stillwater
Mine , Nye Montana.
R.A. Wattson Co:
Construction Manager - Cal Energy
- Casecnan hydroelectric and water
diversion project - Philippines.
Harrison Western/Bacchus Construction:
Manager/General Superintendent
- construction of underground wine
caverns in the Napa Valley, California.
Railroad tunnel rehabilitation in
Nashville, Tennessee and two access
tunnels in Dechutes, Oregon.
Frontier Kemper Constructors:
Drill & Blast Superintendent
- Los Angeles MTA Red Line subway
tunnel track level rooms.
Drill & Blast and Concrete
Superintendent - Portland, OR Tri-Met
light rail tunnels.
Shift Superintendent on excavation
& concrete, Silver Creek Cliff
Tunnel in Two Harbors MN,
(highway tunnel)
Shift Superintendent - excavation
& concrete, Hawaii H3 Koolau
Highway tunnels.
Shift Superintendent - excavation,
Glenwood Springs, CO Interstate
70 highway tunnels.
Patrick Harrison Mining:
2.5 years Superintendent, 1 year
Assistant Superintendent, railroad
tunnel rehabilitation – approximately
40 jobs.
J.S. Redpath:
Shift Foreman (Walker) Excavated
dewatering tunnel
Asamera Minerals:
1.5 years Lead Miner, 6 months
relief shifter. Gold mine development.
Cementation:
Lead Miner. Removing 3000' of timber
sets and replacing with bolts, shotcrete
and steel ribs were needed.
Frontier Kemper Constructors:
1 year Lead Miner, 6 months shifter.
Sank 33' diameter, 1200' deep shaft
and excavated 5000' of 15'x15' drift.
Morrison Knudson:
Cut Deck Driller. Excavated two
3100' railroad tunnels. (Thistle
Tunnels)
West Coast Gas & Oil Gooseberry
Mine:
Lead Miner. Mined gold using breasting
down and back stoping methods for
extracting ores.
Anaconda Copper, Carr Fork Mine:
Graduated Anaconda Copper Carr Fork
Mine Training School for Trackless
Mining Procedures.
1 year Miner, 3 years Lead Miner.
Excavated development drifts and
two 500' raises.
