Manroc Home

Kelly D Cowlishaw

Montana Manroc:

President of Montana Manroc - Stillwater Mine – Nye Montana – Drove approximately 3000’ of development and production Alimak raise. Currently operating four experimental stope designs off of Alimak raise climbers.

Frank Coluccio Construction Company:

Superintendent – Jet Grouting for soil improvement – Hawaii

9’ x 9’ Roadheader Tunnel – Sand Wash Dam, Utah

Thyssen Mining Co:

Superintendent - Getchell Mine Turquoise Ridge Project - Winnemucca Nevada

LRL Construction:

Superintendent - NATM test shaft for Sound Transit Light Rail System (subcontracted by Frank Coluccio Construction Company.

Thyssen Mining Co:

Superintendent - Stillwater Mine, Nye Montana. Development and stope mining.

Guy F. Atkinson/Clark Construction:

Asst. Superintendent - NATM tunneling - San Diego State University light rail tunnel, San Diego, California

Thyssen Mining Co:

General Superintendent - Stillwater Mine , Nye Montana.

R.A. Wattson Co:

Construction Manager - Cal Energy - Casecnan hydroelectric and water diversion project - Philippines.

Harrison Western/Bacchus Construction:

Manager/General Superintendent - construction of underground wine caverns in the Napa Valley, California. Railroad tunnel rehabilitation in Nashville, Tennessee and two access tunnels in Dechutes, Oregon.

Frontier Kemper Constructors:

Drill & Blast Superintendent - Los Angeles MTA Red Line subway tunnel track level rooms.

Drill & Blast and Concrete Superintendent - Portland, OR Tri-Met light rail tunnels.

Shift Superintendent on excavation & concrete, Silver Creek Cliff Tunnel in Two Harbors MN,

(highway tunnel)

Shift Superintendent - excavation & concrete, Hawaii H3 Koolau Highway tunnels.

Shift Superintendent - excavation, Glenwood Springs, CO Interstate 70 highway tunnels.

Patrick Harrison Mining:

2.5 years Superintendent, 1 year Assistant Superintendent, railroad tunnel rehabilitation – approximately 40 jobs.

J.S. Redpath:

Shift Foreman (Walker) Excavated dewatering tunnel

Asamera Minerals:

1.5 years Lead Miner, 6 months relief shifter. Gold mine development.

Cementation:

Lead Miner. Removing 3000' of timber sets and replacing with bolts, shotcrete and steel ribs were needed.

Frontier Kemper Constructors:

1 year Lead Miner, 6 months shifter. Sank 33' diameter, 1200' deep shaft and excavated 5000' of 15'x15' drift.

Morrison Knudson:

Cut Deck Driller. Excavated two 3100' railroad tunnels. (Thistle Tunnels)

West Coast Gas & Oil Gooseberry Mine:

Lead Miner. Mined gold using breasting down and back stoping methods for extracting ores.

Anaconda Copper, Carr Fork Mine: Graduated Anaconda Copper Carr Fork Mine Training School for Trackless Mining Procedures.

1 year Miner, 3 years Lead Miner. Excavated development drifts and two 500' raises.

 

   

 

Kelly Cowlishaw - President

 

 

 

Mike Hare - Vice President